Fourth, the combination of machine installation, commissioning
This machine has been factory commissioning by the successful commissioning and has inspected before the factory inspector, as the complexity of the machine components, the process of transportation in the factory may be demolished in the zero-packing, the customer after receipt of the machine itself in this manual installation, the installation steps are as follows:  

1, first of all, unpack inspection of the machine during transport, whether the collision, the damage caused by compression deformation, if there is anything unusual, please contact our after-sales service hotline, the company from the professional and technical personnel will be deployed treatment.  

2, check all the normal steps according to the following will be placed in the machine near the level at the ground, fitted with four adjustable feet, the combination of track and rolling machine machine adjust the orbit to the same location, after docking leave a certain gap (0.5 ~ 1.5mm).  

3, the vibration plate can be adjusted out on the base, adjust the orbit so that export and import for docking, the gap in (0.5 ~ 1.0mm).  

4, power, power is 220v, and then drive the screw component into the vibration test run, until the screw components of flow after the first full track slowly turn the machine manually for each of the track with the main dial to adjust the distance appropriate, the distance can be processed according to freely adjust the length of the screw.  

5, screw combinations on the main dial into orbit after the screening, selection position to adjust itself according to the size of screws, manual operating normally, you can start the operation of all switches itself  
(Note: the best parts of the foot connecting the ground, so the machine is turned on with induction electric wounding)